Airport City

Aerial view City Airport


Work began on realising the Airport 2000 concept in the early 1990s. The Airport 2000 concept was intended to boost the capacity of the airport and to adapt the overall facility – including its appearance – to future needs. The plans involved remodelling the departure/arrivals terminal, improving the tram link to the airport, building a new hotel (with conference rooms) and a multi-storey car park, as well as the relocation of existing buildings necessitated by this. Also, room for expansion for high-tech commerce close to the airport was to be created.

Funding from the 1992 – 1993 Objective 2 programme was used to clear the site and to link it up to the transport system.

A lot of development work was needed to set up the Airport Gewerbezentrum business park. The routes of the road, canal and railway systems were altered, for which land had to be bought and an area of allotments moved. The site was checked for munitions left over from the War, contamination was cleaned up, plans were made for the future use, and the land was prepared accordingly. The 1994 – 1996 Objective 2 Programme funded measures to clean up pollution.

In view of the high level of demand for sites in the Airport Gewerbezentrum commercial park, the decision was taken to build on the attractiveness of Bremen Airport for businesses and to develop the whole area around the airport as the Airport City business park. This general area includes the Airport Gewerbezentrum, the Ochtum business park, the main market site, the DASA building and the Georg-Wulff-Strasse business park.

Categories
urban development
Programmes
Programms 1994 - 1999
Total volume of money (in €)
13.042.302,00
Proportion of funds
Total support: 13,042,302 €
of which ERDF: 6,521,151€
Runtime
01.01.1994 - 30.09.1998
Venue
Bremen south
Contact
Ministry of Economics, Labour and Ports
Zweite Schlachtpforte 3
28195 Bremen
Germany
Tel.: +49 421 3618808
Fax: +49 421 3618717
E-Mail: Office@wah.bremen.de


Airport City

Business park at the airport

Description:

Work began on realising the Airport 2000 concept in the early 1990s. The Airport 2000 concept was intended to boost the capacity of the airport and to adapt the overall facility – including its appearance – to future needs. The plans involved remodelling the departure/arrivals terminal, improving the tram link to the airport, building a new hotel (with conference rooms) and a multi-storey car park, as well as the relocation of existing buildings necessitated by this. Also, room for expansion for high-tech commerce close to the airport was to be created.

Funding from the 1992 – 1993 Objective 2 programme was used to clear the site and to link it up to the transport system.

A lot of development work was needed to set up the Airport Gewerbezentrum business park. The routes of the road, canal and railway systems were altered, for which land had to be bought and an area of allotments moved. The site was checked for munitions left over from the War, contamination was cleaned up, plans were made for the future use, and the land was prepared accordingly. The 1994 – 1996 Objective 2 Programme funded measures to clean up pollution.

In view of the high level of demand for sites in the Airport Gewerbezentrum commercial park, the decision was taken to build on the attractiveness of Bremen Airport for businesses and to develop the whole area around the airport as the Airport City business park. This general area includes the Airport Gewerbezentrum, the Ochtum business park, the main market site, the DASA building and the Georg-Wulff-Strasse business park.

The Ochtum commercial park was enhanced with new transport links and improved sites, and made available to more businesses as the Airport City West. The 1997 – 1999 Objective 2 Programme financed infrastructure measures, site clearances, and the detection and treatment of pollution.

The picture shows part of the central Airport City. At the curve in the road, there is the Airport Business Start-up Centre (a project of the 2000 – 2006 Objective 2 Programme), which was opened at the beginning of 2002.


programm
Objective 2,Environmental rotection Site rehabilitation
1992 – 1999Total support: 13,042,302 €